top of page

Nutrien Lanigan Loadout Dust Collection Piping Replacement

Dingwall Guitars

Nutrien Thickener center-well Structural Steel Stiffening and Refurbishment.

Nutrien Lanigan Rotex Screen Replacement

K+S-Bucket Elevator CE-901 & CE-971

Nutrien Cory Flexiveyor Assembly

SSR Mine Ventilation Upgrade

Crop Production Miscellaneous steel design, manufacture and installation

Nutrien Cory New Underground Maintenance Shop and Warehouse

Nutrien Lanigan Piping Service Tunnel

Nutrien Lanigan- Dust Collection Piping

Nutrien Allan Dissolver Tank Concrete Refurbishment

K+S-Bucket Elevator CE-911

Nutrien Cory Bin #4 Maintenance Platform Fabrication Install

Nutrien Cory Relocation of underground maintenance shop & warehouse to safer ground
![IMG_1921[1].JPG](https://static.wixstatic.com/media/cda87d_7a59a16bf4b24e9e8150994af593b83d~mv2_d_1920_1440_s_2.jpg/v1/fill/w_225,h_169,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_1921%5B1%5D_JPG.jpg)
SSR Camp upgrade to facilities

Lewis Carter design, build, supply and install and commission seed cleaning facility

K+S Bucket Elevator CE-931

Nutrien Lanigan Cyclone Test Stand

K+S-Bucket Elevator CE-900

K+S-Bucket Elevator CE-921

Nutrien Cory Sump Brine Line

SSR capital project engineer Secondment

Federated CO-OP Packaging Equipment Installation and Facility Upgrades

bottom of page