Nutrien Thickener Center-Well Structural Steel Stiffening and Refurbishment- 2021

Scope: Fabrication and install of all structural pieces outlined in the drawings including all welding, painting touch ups and miscellaneous pieces needed for the install. Provided fabrication drawings.

Project schedule duration: 3 Months

.