Nutrien Lanigan Loadout Dust Collection Piping Replacement- 2021

Scope: Replacement of roughly 1000ft of FRP pipe ranging in size 3”-6”. Supply and install of vertical and cantilevered pipe supports. Fusion installed as much pipe as possible before demo to reduce down time required. Fabrication and install of stairs.

Project schedule duration: 2 Months

​