Crop Production Services 2017-2018

Project: Miscellaneous steel design, manufacture and installation.  

Project Schedule Duration: 1 years

FMG’s Scope: Replacement of roof covering, installation of catwalks, ramp mezzanine and staircase.

Project Location: Arborfield, Saskatchewan

Project Successes: Continuing success

CPS Steel Design and Install
cps steel stairs
CPS